Wednesday 29 July 2009

Detailing 1




Last week we undid the ropes and got the Nateetong mobile again to move her from in front of Mike's place to the Boat Lagoon Marina. All went smoothly apart fromt he steering being hooked up back to front so that turning the wheel to the right moved the boat to the left. Made the winding Boat Lagoon channel a little more challenging than normal.

Kao and Geng have been getting on with the painting as well as installing deck drains on the side decks. Yung and Lek have been busy welding up the top deck raili
ng, fitting the swim platform and today constructing the mast.

Today there were couple of carpenters on board tidying up the last loose ends from the wheelhouse job. Hopefully next week I will be able to get them to do the beds in the front cabin.

Here are some pictures.